PileTech Misr Foundation Drilling & Construction - S.A.E

8 Mohamed Wagih Ahmed St., Wabour el mayah, Alexandria In Front Of Wabour EL Mayah Elementary School

Open,Monday,09:00

away

Rating / (0) reviews

Show Map
About
Established in 2009 based on a team of experienced staff, working in cooperation with major construction consulting offices, Member of the Egyptian Federation of Construction and Building Contractors (4th category). The company works in implementation of deep mechanical foundations "Continuous Flight Auger (CFA) type & shoring walls tangent and secant piles using the necessary equipment and Pile Integrity Test (PIT).

Business Description

Pile Tech Misr Foundation Drilling and Construction - Experts in deep mechanical foundations
- Pile Tech Egypt Foundation Drilling and Construction Company was established in 2009, based on distinguished expertise and cadres and under the supervision of consulting offices specialized in the field of construction. A member of the Egyptian Federation for Construction and Building Contractors with a Category 4 classification. We specialize in implementing deep mechanical foundations using advanced techniques such as continuous auger drilling (C.F.A.) and acoustic probing testing (P.I.T).
 
Work Team
Our company consists of an integrated team of engineers with experience in the field of deep foundations and mechanical engineers specialized in the maintenance of foundation equipment, in addition to equipment operators with long experience in the field.
 
Types of piles used
1. Rotary drilling piles:
- Using a mixture of bentonite and water to support the sides of the pile drilling
- Diameters from 60 cm to 150 cm.
- Lengths up to 42 meters.
 
2. Continuous auger drilling piles C.F.A:
- Diameters from 30 cm to 90 cm.
 
3. Retaining walls:
- From adjacent and intersecting piles to create basements and support the sides of the excavation.
 
4. Drying works:
• Reducing groundwater levels and isolation.
 
5. Implementation of pile caps and garages:
• Up to the ground floor level.
 
Equipment and techniques used
We use advanced mechanical foundation equipment and auxiliary equipment with quality control and monitoring programs. We use pile data loggers for the C.F.A. continuous auger drilling system with TARALOG devices, to know the depth and section of the pile, adjust the verticality, and concrete pumping rates, with a graph of the pile section during and after implementation. We also use voice palpation testing (P.I.T) to ensure quality implementation.
 
Services:
Building Works:
- Implementing construction projects with high efficiency.
 
Foundation Works:
- Providing integrated solutions for deep foundations.
 
Complementary (specialized) Works:
- Providing specialized solutions for various projects.
 
Road, bridge, railway and airport Works:
- Implementing large infrastructure projects.
 
Water, sewage, gas and fuel stations and networks:
- Providing integrated solutions for infrastructure.
 
Marine, river and dredging works:
Land Reclamation:
Drilling wells:
- Providing well drilling services.
 
Electromechanical, electronic and communication networks works:
- Providing integrated solutions for electromechanical and electronic works.

Categories (2)

No Ratings Available

Be the first Reviewer!

Send an email to PileTech Misr Foundation Drilling & Construction - S.A.E for more information

Working Hours

Sunday

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

09:00 - 16:00

09:00 - 16:00

09:00 - 16:00

09:00 - 16:00

09:00 - 16:00

Closed

09:00 - 16:00